Pith. sign in

REVIEW

Towards the full realization of the RIBLL2 beam line at the HIRFL-CSR complex

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1712.02602 v2 pith:AHDJADLO submitted 2017-12-07 physics.acc-ph nucl-exnucl-th

Towards the full realization of the RIBLL2 beam line at the HIRFL-CSR complex

classification physics.acc-ph nucl-exnucl-th
keywords beamribll2aroundbeenfacilityfullhirfl-csrline
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

The RIBLL2 in-flight separator at IMP, the secondary beam line between two storage rings at the \blue{\uwave{Heavy Ion Research Facility in Lanzhou (HIRFL-CSR)}}, has been commissioned to study the rare-isotope beam (RIB) physics at around 300 MeV/nucleon for the first time, in combination of the external target facility (ETF). The unambiguous particle identification in mass and charge states for $^{18}$O and $^{40}$Ar fragments has been achieved in recent experiments. A full realization of RIBLL2 will open many potentials to address important RIB physics problems at around 300 MeV/nucleon.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.