Pith. sign in

REVIEW

Development and operational experience of magnetic horn system for T2K experiment

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1502.01737 v1 pith:CYYCHDYE submitted 2015-02-05 physics.ins-det hep-ex

Development and operational experience of magnetic horn system for T2K experiment

classification physics.ins-det hep-ex
keywords magneticoperationexperimenthornsbeamexperiencehornoperated
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

A magnetic horn system to be operated at a pulsed current of 320 kA and to survive high-power proton beam operation at 750 kW was developed for the T2K experiment. The first set of T2K magnetic horns was operated for over 12 million pulses during the four years of operation from 2010 to 2013, under a maximum beam power of 230 kW, and $6.63\times10^{20}$ protons were exposed to the production target. No significant damage was observed throughout this period. This successful operation of the T2K magnetic horns led to the discovery of the $\nu_{\mu}\rightarrow\nu_e$ oscillation phenomenon in 2013 by the T2K experiment. In this paper, details of the design, construction, and operation experience of the T2K magnetic horns are described.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.