Pith. sign in

REVIEW

Substation One-Line Diagram Automatic Generation and Visualization

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1903.09495 v1 pith:XWZEIBSM submitted 2019-03-20 cs.OH cs.SYeess.SY

Substation One-Line Diagram Automatic Generation and Visualization

classification cs.OH cs.SYeess.SY
keywords substationolndsystemolndspowertoolautomaticautomatically
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

In Energy Management System (EMS) applications and many other off-line planning and study tools, one-line diagram (OLND) of the whole system and stations is a straightforward view for planners and operators to design, monitor, analyze, and control the power system. Large-scale power system OLND is usually manually developed and maintained. The work is tedious, time-consuming and ease to make mistake. Meanwhile, the manually created diagrams are hard to be shared among the on-line and off-line systems. To save the time and efforts to draw and maintain OLNDs, and provide the capability to share the OLNDs, a tool to automatically develop substation based upon Common Information Model (CIM) standard is needed. Currently, there is no standard rule to draw the substation OLND. Besides, the substation layouts can be altered from the typical formats in textbooks based on factors of economy, efficiency, engineering practice, etc. This paper presents a tool on substation OLND automatic generation and visualization. This tool takes the substation CIM/E model as input, then automatically computes the coordinates of all components and generates the substation OLND based on its components attributes and connectivity relations. Evaluation of the proposed approach is presented using a real provincial power system. Over 95\% of substation OLNDs are decently presented and the rest are corner cases, needing extra effort to do specific reconfiguration.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.