REVIEW
Towards the full realization of the RIBLL2 beam line at the HIRFL-CSR complex
Not yet reviewed by Pith; the record is open.
This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.
SPECIMEN: schema-true, not a live event
T0 review · schema-true
One-sentence machine reading of the paper's core claim.
pith:XXXXXXXX · record.json · timestamp
Towards the full realization of the RIBLL2 beam line at the HIRFL-CSR complex
read the original abstract
The RIBLL2 in-flight separator at IMP, the secondary beam line between two storage rings at the \blue{\uwave{Heavy Ion Research Facility in Lanzhou (HIRFL-CSR)}}, has been commissioned to study the rare-isotope beam (RIB) physics at around 300 MeV/nucleon for the first time, in combination of the external target facility (ETF). The unambiguous particle identification in mass and charge states for $^{18}$O and $^{40}$Ar fragments has been achieved in recent experiments. A full realization of RIBLL2 will open many potentials to address important RIB physics problems at around 300 MeV/nucleon.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.