Pith. sign in

REVIEW 1 cited by

SPS Beam Dump Facility -- Comprehensive Design Study

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1912.06356 v1 pith:ZHNOCEYM submitted 2019-12-13 physics.acc-ph

SPS Beam Dump Facility -- Comprehensive Design Study

classification physics.acc-ph
keywords facilitybeamdumpdesignfirsttargetareacomprehensive
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

The proposed Beam Dump Facility (BDF) is foreseen to be located at the North Area of the SPS. It is designed to be able to serve both beam dump like and fixed target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector models, and flavour physics measurements. In the first instance, exploitation of the facility, in beam dump mode, is envisaged to be for the Search for Hidden Particle (SHiP) experiment. Following the first evaluation of the BDF in 2014-2016, CERN management launched a Comprehensive Design Study over three years for the facility. The BDF study team has since executed an in-depth feasibility study of proton delivery to target, the target complex, and the underground experimental area, including prototyping of key sub-systems and evaluations of the radiological aspects and safety. A first iteration of detailed integration and civil engineering studies have been performed in order to produce a realistic schedule and cost. This document gives a detailed overview of the proposed facility together with the results of the studies, and draws up a possible road map for a three-year Technical Design Report phase, followed by a 5 to 6 year construction phase.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.

Forward citations

Cited by 1 Pith paper

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score.

  1. Beam-Dump Ceiling and Its Experimental Implication: The Case of a Portable Experiment

    hep-ph 2024-01 unverdicted novelty 6.0

    Beam-dump experiments for visibly decaying mediators hit an intrinsic sensitivity ceiling in the prompt-decay region that cannot be overcome by more data or better backgrounds, favoring compact portable setups.