Pith. sign in

REVIEW

Tail Risk Constraints and Maximum Entropy

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1412.7647 v1 pith:LEDP5GLS submitted 2014-12-24 q-fin.RM

Tail Risk Constraints and Maximum Entropy

classification q-fin.RM
keywords constraintsportfoliomaximumotherconstructiondistributionsentropyleft-tail
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

In the world of modern financial theory, portfolio construction has traditionally operated under at least one of two central assumptions: the constraints are derived from a utility function and/or the multivariate probability distribution of the underlying asset returns is fully known. In practice, both the performance criteria and the informational structure are markedly different: risk-taking agents are mandated to build portfolios by primarily constraining the tails of the portfolio return to satisfy VaR, stress testing, or expected shortfall (CVaR) conditions, and are largely ignorant about the remaining properties of the probability distributions. As an alternative, we derive the shape of portfolio distributions which have maximum entropy subject to real-world left-tail constraints and other expectations. Two consequences are (i) the left-tail constraints are sufficiently powerful to overide other considerations in the conventional theory, rendering individual portfolio components of limited relevance; and (ii) the "barbell" payoff (maximal certainty/low risk on one side, maximum uncertainty on the other) emerges naturally from this construction.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.