Pith. sign in

REVIEW 1 cited by

The design and commissioning of the MICE upstream time-of-flight system

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1001.4426 v2 pith:E37JVSAW submitted 2010-01-25 physics.ins-det

The design and commissioning of the MICE upstream time-of-flight system

classification physics.ins-det
keywords beammicetime-of-flightupstreamexperimentsystemtimingaccelerating
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

In the MICE experiment at RAL the upstream time-of-flight detectors are used for particle identification in the incoming muon beam, for the experiment trigger and for a precise timing (sigma_t ~ 50 ps) with respect to the accelerating RF cavities working at 201 MHz. The construction of the upstream section of the MICE time-of-flight system and the tests done to characterize its individual components are shown. Detector timing resolutions ~50-60 ps were achieved. Test beam performance and preliminary results obtained with beam at RAL are reported.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.

Forward citations

Cited by 1 Pith paper

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score.

  1. First demonstration of ionization cooling by the Muon Ionization Cooling Experiment

    physics.acc-ph 2019-07 unverdicted novelty 9.0

    MICE reports the first experimental demonstration of ionization cooling for muon beams.